ISO 21725-2:2021
p
ISO 21725-2:2021
71513
недоступно на русском языке

This document provides information to perform the design of the prestressed concrete box girder bridge for road that complies with the limitations established in 6.1. The rules of design as set forth in the document are simplifications of more elaborate requirements. Among several erection methods of box girder bridges, the provisions of this document are mainly applicable to full staging method (FSM).

Designs and details for new road bridges address structural integrity by considering the following:

—    the use of continuity and redundancy to provide one or more alternate paths;

—    structural members and bearing seat widths that are resistant to damage or instability; and

—    external protection systems to minimize the effects of reasonably conceived severe loads.


Общая информация 

  •  :  Published
     : 2021-11
  •  : 1
  •  : ISO/TC 71/SC 5 Simplified design standard for concrete structures
  •  :
    93.040 Bridge construction
    91.080.40 Concrete structures

Приобрести данный стандарт

ru
Формат Язык
std 1 208 PDF + ePub
std 2 208 Бумажный
  • CHF208

Жизненный цикл


Появились вопросы?

Ознакомьтесь с FAQ

Работа с клиентами
+41 22 749 08 88

Часы работы:
Понедельник – пятница: 09:00-12:00, 14:00-17:00 (UTC+1)

Будьте в курсе актуальных новостей ИСО

Подписывайтесь на наши новости, обзоры, а также на информацию о продуктах.