Approved Work Item
ISO/AWI 24695
Oil and gas industries including lower carbon energy — The effects of High Voltage DC interference to buried pipelines — Measures to be implemented
Reference number
ISO/AWI 24695
Edition 1
Approved Work Item
ISO/AWI 24695
88001
A working group has prepared a draft.

Abstract

This document describes technical measures to be carried out at crossings and parallelisms of buried metal pipelines influenced by HVDC systems. It provides guidance on how the design, construction, operation, maintenance, and decommissioning phases of HVDC systems affect buried metal pipelines. Electrical interference conditions (AC and DC) to pipeline systems are described, and acceptable levels of interference are discussed. Minimum separation distances are recommended. The following aspects are not covered in this document: -Contractual responsibilities -Personnel safety

General information

  •  : Under development
    : New project registered in TC/SC work programme [20.00]
  •  : 1
  • ISO/TC 67/SC 2
  • RSS updates

Got a question?

Check out our Help and Support