Abstract
Establishes a consistent arrangement and movement for the basic controls used during the crane-operation cycle for slewing, load hoisting and lowering, jib luffing and telescoping. Defines the requirements, and direction of movement of these controls. Deals with bi-directional controls. Cross-shift levers (multi-directional) are under consideration.
General information
-
Status: WithdrawnPublication date: 1985-08Stage: Withdrawal of International Standard [95.99]
-
Edition: 1Number of pages: 5
-
Technical Committee :ISO/TC 96/SC 6ICS :53.020.20
- RSS updates
Life cycle
-
Now
-
00
Preliminary
-
10
Proposal
-
20
Preparatory
-
30
Committee
-
40
Enquiry
-
50
Approval
-
60
Publication
-
90
Review
-
95
Withdrawal
Corrigenda / Amendments
WithdrawnISO 7752-2:1985/Add 1:1986
-
00
-
Revised by
PublishedISO 7752-2:2011
Got a question?
Check out our FAQs
Customer care
+41 22 749 08 88
Opening hours:
Monday to Friday - 09:00-12:00, 14:00-17:00 (UTC+1)